Laboratory fit-out checklist: from survey to handover

Published 7 min read

Laboratory renovations go wrong in predictable ways: missing drawings, surprises behind walls, and no plan for keeping neighbouring areas running.

This checklist follows the four stages we work in, survey, design, fit-out and handover, and flags what to settle at each.

Pharma laboratory with stainless steel benches

The four stages

  1. Survey

    Measure the space and record its condition. Verify on site rather than trusting old drawings.

    Laser level used to survey a floor
  2. Design

    Layouts and drawings built around your workflow, equipment and compliance needs.

    Engineer reviewing a drawing on site
  3. Fit-out

    Installation by our crews, coordinated with equipment suppliers and the building services contractor.

    Installer fitting a unit during fit-out
  4. Handover

    Testing, commissioning and documentation, ready to use.

    Finished laboratory bench with glassware, ready for use

Survey: settle these first

  • Existing drawings

    Missing or outdated records are common. Field verification, from tape measure to laser scanning, avoids late surprises.

  • Access and loads

    Check corridor widths, doors and slab capacity so heavy equipment can actually be moved in.

  • Hazardous materials

    Older buildings may contain materials such as asbestos or lead paint that need proper removal, which affects cost and time.

  • Decontamination

    The lab must be cleared and decontaminated before works begin. Leftover chemicals have delayed refurbishments before.

Design: decide these early

  • Workflow and zones

    Wet, dry and clean zones, equipment positions, benches and storage.

  • Services

    Power, data, water, gases and extraction at each station, agreed with the services contractor.

  • Surfaces

    Worktop material, flooring grade and wall finishes chosen for your chemicals, heat and cleaning regime.

  • Commissioning requirements

    Say early what needs commissioning and tested, so the design and the programme allow for it.

Fit-out: protect the programme

  • Phasing

    Plan phases so parts of the lab can stay operational. A full shutdown is a last resort, best timed to a quiet period.

  • Coordination

    Sequence flooring, benches, hoods and services so trades do not block each other.

  • Equipment delivery

    Confirm lead times for hoods, benches and specialist equipment against the programme.

Handover: what you should receive

  • As-built information

    Drawings showing what was actually installed.

  • Test and commissioning results

    Records such as fume cupboard face velocity and airflow tests, as required by your project.

  • Manuals and care guidance

    Operation, maintenance and cleaning instructions for installed items.

  • Product data

    Data sheets and installation records for your quality file.

Frequently asked questions

How long does a lab renovation take?

It depends on size and scope. A programme is given after the survey and design stage.

Can the lab keep working during the works?

Often yes, with phased works agreed during the survey. Some phases may need a short, planned shutdown.

Who handles ventilation and electrical work?

Normally the building services contractor. We coordinate with them and deliver the finishes, benches, surfaces and equipment fit-out.